Tuesday, June 12, 2007

Kitchen very close to finished



I'm almost done with the kitchen. Handles are on, appliances are connected. Just need to finish up some trim and then fill the cabinets.

The basement is almost done too. Painting has started (I'll get more pics later). Painting will go on for several days now.

Monday, June 04, 2007

more cabinet fun

No pictures this time. I've just about finished putting in the handles on the cabinets... Now its time for filling in the gaps. The cabinets have about 2 inches of gap between some of them, and I need to fill that with some of the "toe-kick" material. Any, I'll post a picture of it soon and you can see what I mean.

Friday, June 01, 2007

Gas cooktop installed

No picture today, just a quick update.

Last night I had fun putting soap on the gas pipe connections I put together to see if any bubbles would form.... some did. I had to redo the piping a couple of times, but I think I got the gas pipes connected good and tight.
The cooktop works... one more appliance installed.
Next up is the exhaust fan. Its connected and operating, but it does not vent outside yet.